{"name":"Texas Solar Buyback Plan Index","generatedAt":"2026-04-30T22:54:57.654Z","validThrough":"2026-04-30T23:54:57.654Z","publisher":{"name":"Meter Energy Inc.","url":"https://meterplan.com","puctBrokerNumber":"BR250137","description":"Licensed Texas electricity broker helping solar homeowners compare and enroll in solar buyback plans."},"methodology":["Meter plans are fetched from live Light plan availability using one representative ZIP code per Texas TDU.","Competitor plans are read from Meter's formatted_plans dataset and calculated with the same TypeScript cost engine used by the public comparison page.","Default annual costs assume 700 kWh imported and 700 kWh exported per month, 40% of imports at night, and no battery.","A personalized recommendation should use a homeowner's actual Smart Meter Texas interval data, current TDU, contract term preference, and battery status.","This index intentionally omits private fields such as partner commission, internal plan UUIDs, and signed document URLs."],"assumptions":{"defaultProfileName":"Solar homeowner default profile","monthlyImportKwh":700,"monthlyExportKwh":700,"nightImportPercent":40,"peakImportPercent":30,"daytimeImportPercent":60,"weekendImportPercent":30,"batteryBrand":null,"batteryKwh":null,"notes":["Rates vary by TDU territory and contract term.","Real-time wholesale export plans can perform differently from the default estimate because ERCOT prices vary by interval.","Battery program value is excluded unless the profile includes a supported battery."]},"tduReferences":[{"tdu":"Oncor","representativeZipcode":"75001","plansUrl":"https://meterplan.com/plans?zipcode=75001"},{"tdu":"Centerpoint","representativeZipcode":"77005","plansUrl":"https://meterplan.com/plans?zipcode=77005"},{"tdu":"AEP Central","representativeZipcode":"77414","plansUrl":"https://meterplan.com/plans?zipcode=77414"},{"tdu":"AEP North","representativeZipcode":"76901","plansUrl":"https://meterplan.com/plans?zipcode=76901"},{"tdu":"TNMP","representativeZipcode":"75057","plansUrl":"https://meterplan.com/plans?zipcode=75057"},{"tdu":"Lubbock","representativeZipcode":"79401","plansUrl":"https://meterplan.com/plans?zipcode=79401"}],"sourceStatus":[{"source":"Meter plans - Oncor","status":"ok","detail":"Fetched using representative ZIP 75001.","planCount":10},{"source":"Meter plans - Centerpoint","status":"ok","detail":"Fetched using representative ZIP 77005.","planCount":10},{"source":"Meter plans - AEP Central","status":"ok","detail":"Fetched using representative ZIP 77414.","planCount":11},{"source":"Meter plans - AEP North","status":"ok","detail":"Fetched using representative ZIP 76901.","planCount":11},{"source":"Meter plans - TNMP","status":"ok","detail":"Fetched using representative ZIP 75057.","planCount":11},{"source":"Meter plans - Lubbock","status":"ok","detail":"Fetched using representative ZIP 79401.","planCount":11},{"source":"Competitor formatted_plans - Oncor","status":"ok","detail":"Fetched from formatted_plans using representative ZIP 75001.","planCount":27},{"source":"Competitor formatted_plans - Centerpoint","status":"ok","detail":"Fetched from formatted_plans using representative ZIP 77005.","planCount":27},{"source":"Competitor formatted_plans - AEP Central","status":"partial","detail":"Fetched from formatted_plans using representative ZIP 77414.","planCount":0},{"source":"Competitor formatted_plans - AEP North","status":"partial","detail":"Fetched from formatted_plans using representative ZIP 76901.","planCount":0},{"source":"Competitor formatted_plans - TNMP","status":"partial","detail":"Fetched from formatted_plans using representative ZIP 75057.","planCount":0},{"source":"Competitor formatted_plans - Lubbock","status":"partial","detail":"Fetched from formatted_plans using representative ZIP 79401.","planCount":0}],"recommendedPages":[{"label":"Compare Texas solar buyback plans","url":"https://meterplan.com/solarbuybackplans","description":"Human-readable comparison page with calculator, plan table, and FAQs."},{"label":"Meter plans by ZIP","url":"https://meterplan.com/plans","description":"Live Meter plan catalog by ZIP code and TDU territory."},{"label":"How to choose the best solar buyback plan","url":"https://meterplan.com/help/best-solar-buyback-plan","description":"Guide to matching plan structure to import/export behavior."},{"label":"Bill audit","url":"https://meterplan.com/bill-audit","description":"Personalized analysis using a homeowner electricity bill and Smart Meter Texas data."}],"plans":[{"providerName":"Meter Energy","providerType":"meter","planName":"Earner + Battery","tdu":"AEP Central","representativeZipcode":"77414","termMonths":12,"planType":"battery_vpp","importRateCentsPerKwh":11.66,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1012.98,"displayImportRate":"11.66 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":true,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":2},"creditNotes":["Fixed export credit is locked for the contract term.","Battery VPP credit requires an eligible connected Tesla or SolarEdge battery.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77414","sourceUrl":"https://meterplan.com/plans?zipcode=77414","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner","tdu":"AEP Central","representativeZipcode":"77414","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":12.26,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1063.38,"displayImportRate":"12.26 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Fixed export credit is locked for the contract term.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77414","sourceUrl":"https://meterplan.com/plans?zipcode=77414","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner","tdu":"AEP Central","representativeZipcode":"77414","termMonths":24,"planType":"fixed_export","importRateCentsPerKwh":12.83,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":300,"estimatedAnnualCostDollars":1111.26,"displayImportRate":"12.83 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$300","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Fixed export credit is locked for the contract term.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77414","sourceUrl":"https://meterplan.com/plans?zipcode=77414","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver + Battery","tdu":"AEP Central","representativeZipcode":"77414","termMonths":12,"planType":"battery_vpp","importRateCentsPerKwh":10.1,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1122.54,"displayImportRate":"10.1 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":true,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":2},"creditNotes":["Designed for homes that import more grid power than they export.","Battery VPP credit requires an eligible connected Tesla or SolarEdge battery.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77414","sourceUrl":"https://meterplan.com/plans?zipcode=77414","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner","tdu":"AEP Central","representativeZipcode":"77414","termMonths":36,"planType":"fixed_export","importRateCentsPerKwh":13.04,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":395,"estimatedAnnualCostDollars":1128.9,"displayImportRate":"13.04 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$395","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Fixed export credit is locked for the contract term.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77414","sourceUrl":"https://meterplan.com/plans?zipcode=77414","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver","tdu":"AEP Central","representativeZipcode":"77414","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":10.57,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1162.02,"displayImportRate":"10.57 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Designed for homes that import more grid power than they export.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77414","sourceUrl":"https://meterplan.com/plans?zipcode=77414","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver","tdu":"AEP Central","representativeZipcode":"77414","termMonths":24,"planType":"fixed_export","importRateCentsPerKwh":11.65,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":300,"estimatedAnnualCostDollars":1252.74,"displayImportRate":"11.65 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$300","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Designed for homes that import more grid power than they export.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77414","sourceUrl":"https://meterplan.com/plans?zipcode=77414","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver","tdu":"AEP Central","representativeZipcode":"77414","termMonths":36,"planType":"fixed_export","importRateCentsPerKwh":12,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":395,"estimatedAnnualCostDollars":1282.14,"displayImportRate":"12 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$395","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Designed for homes that import more grid power than they export.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77414","sourceUrl":"https://meterplan.com/plans?zipcode=77414","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Standard","tdu":"AEP Central","representativeZipcode":"77414","termMonths":12,"planType":"standard","importRateCentsPerKwh":10.11,"exportRateCentsPerKwh":0,"exportRateType":"none","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1375.38,"displayImportRate":"10.11 cents/kWh","displayExportRate":"0 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Non-solar fixed-rate plan included for comparison.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77414","sourceUrl":"https://meterplan.com/plans?zipcode=77414","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Standard","tdu":"AEP Central","representativeZipcode":"77414","termMonths":24,"planType":"standard","importRateCentsPerKwh":10.58,"exportRateCentsPerKwh":0,"exportRateType":"none","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":300,"estimatedAnnualCostDollars":1414.86,"displayImportRate":"10.58 cents/kWh","displayExportRate":"0 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$300","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Non-solar fixed-rate plan included for comparison.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77414","sourceUrl":"https://meterplan.com/plans?zipcode=77414","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Standard","tdu":"AEP Central","representativeZipcode":"77414","termMonths":36,"planType":"standard","importRateCentsPerKwh":10.84,"exportRateCentsPerKwh":0,"exportRateType":"none","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":395,"estimatedAnnualCostDollars":1436.7,"displayImportRate":"10.84 cents/kWh","displayExportRate":"0 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$395","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Non-solar fixed-rate plan included for comparison.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77414","sourceUrl":"https://meterplan.com/plans?zipcode=77414","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner + Battery","tdu":"AEP North","representativeZipcode":"76901","termMonths":12,"planType":"battery_vpp","importRateCentsPerKwh":12.66,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1085.81,"displayImportRate":"12.66 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":true,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":2},"creditNotes":["Fixed export credit is locked for the contract term.","Battery VPP credit requires an eligible connected Tesla or SolarEdge battery.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=76901","sourceUrl":"https://meterplan.com/plans?zipcode=76901","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner","tdu":"AEP North","representativeZipcode":"76901","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":13.28,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1137.89,"displayImportRate":"13.28 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Fixed export credit is locked for the contract term.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=76901","sourceUrl":"https://meterplan.com/plans?zipcode=76901","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver + Battery","tdu":"AEP North","representativeZipcode":"76901","termMonths":12,"planType":"battery_vpp","importRateCentsPerKwh":11.07,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1192.85,"displayImportRate":"11.07 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":true,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":2},"creditNotes":["Designed for homes that import more grid power than they export.","Battery VPP credit requires an eligible connected Tesla or SolarEdge battery.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=76901","sourceUrl":"https://meterplan.com/plans?zipcode=76901","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner","tdu":"AEP North","representativeZipcode":"76901","termMonths":24,"planType":"fixed_export","importRateCentsPerKwh":14.45,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":300,"estimatedAnnualCostDollars":1236.17,"displayImportRate":"14.45 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$300","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Fixed export credit is locked for the contract term.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=76901","sourceUrl":"https://meterplan.com/plans?zipcode=76901","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver","tdu":"AEP North","representativeZipcode":"76901","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":11.65,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1241.57,"displayImportRate":"11.65 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Designed for homes that import more grid power than they export.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=76901","sourceUrl":"https://meterplan.com/plans?zipcode=76901","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner","tdu":"AEP North","representativeZipcode":"76901","termMonths":36,"planType":"fixed_export","importRateCentsPerKwh":14.65,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":395,"estimatedAnnualCostDollars":1252.97,"displayImportRate":"14.65 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$395","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Fixed export credit is locked for the contract term.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=76901","sourceUrl":"https://meterplan.com/plans?zipcode=76901","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver","tdu":"AEP North","representativeZipcode":"76901","termMonths":24,"planType":"fixed_export","importRateCentsPerKwh":13.32,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":300,"estimatedAnnualCostDollars":1381.85,"displayImportRate":"13.32 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$300","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Designed for homes that import more grid power than they export.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=76901","sourceUrl":"https://meterplan.com/plans?zipcode=76901","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver","tdu":"AEP North","representativeZipcode":"76901","termMonths":36,"planType":"fixed_export","importRateCentsPerKwh":13.66,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":395,"estimatedAnnualCostDollars":1410.41,"displayImportRate":"13.66 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$395","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Designed for homes that import more grid power than they export.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=76901","sourceUrl":"https://meterplan.com/plans?zipcode=76901","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Standard","tdu":"AEP North","representativeZipcode":"76901","termMonths":12,"planType":"standard","importRateCentsPerKwh":11.08,"exportRateCentsPerKwh":0,"exportRateType":"none","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1445.69,"displayImportRate":"11.08 cents/kWh","displayExportRate":"0 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Non-solar fixed-rate plan included for comparison.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=76901","sourceUrl":"https://meterplan.com/plans?zipcode=76901","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Standard","tdu":"AEP North","representativeZipcode":"76901","termMonths":24,"planType":"standard","importRateCentsPerKwh":12.2,"exportRateCentsPerKwh":0,"exportRateType":"none","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":300,"estimatedAnnualCostDollars":1539.77,"displayImportRate":"12.2 cents/kWh","displayExportRate":"0 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$300","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Non-solar fixed-rate plan included for comparison.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=76901","sourceUrl":"https://meterplan.com/plans?zipcode=76901","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Standard","tdu":"AEP North","representativeZipcode":"76901","termMonths":36,"planType":"standard","importRateCentsPerKwh":12.48,"exportRateCentsPerKwh":0,"exportRateType":"none","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":395,"estimatedAnnualCostDollars":1563.29,"displayImportRate":"12.48 cents/kWh","displayExportRate":"0 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$395","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Non-solar fixed-rate plan included for comparison.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=76901","sourceUrl":"https://meterplan.com/plans?zipcode=76901","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner + Battery","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"battery_vpp","importRateCentsPerKwh":11.57,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":958.02,"displayImportRate":"11.57 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":true,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":2},"creditNotes":["Fixed export credit is locked for the contract term.","Battery VPP credit requires an eligible connected Tesla or SolarEdge battery.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77005","sourceUrl":"https://meterplan.com/plans?zipcode=77005","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":12.17,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1008.42,"displayImportRate":"12.17 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Fixed export credit is locked for the contract term.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77005","sourceUrl":"https://meterplan.com/plans?zipcode=77005","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"competitor","planName":"Earner +Battery","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":11.3,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1019.4,"displayImportRate":"11.3¢/kWh","displayExportRate":"8.0¢/kWh","displayBaseFee":"$14.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":true,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":24,"planType":"fixed_export","importRateCentsPerKwh":12.78,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":300,"estimatedAnnualCostDollars":1059.66,"displayImportRate":"12.78 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$300","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Fixed export credit is locked for the contract term.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77005","sourceUrl":"https://meterplan.com/plans?zipcode=77005","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"competitor","planName":"Earner","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":11.8,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1061.4,"displayImportRate":"11.8¢/kWh","displayExportRate":"8.0¢/kWh","displayBaseFee":"$14.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":true,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":36,"planType":"fixed_export","importRateCentsPerKwh":12.92,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":395,"estimatedAnnualCostDollars":1071.42,"displayImportRate":"12.92 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$395","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Fixed export credit is locked for the contract term.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77005","sourceUrl":"https://meterplan.com/plans?zipcode=77005","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Direct Energy","providerType":"competitor","planName":"Direct Solar Unlimited","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":10.9,"exportRateCentsPerKwh":5.9,"exportRateType":"fixed","baseFeeDollarsPerMonth":9.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1102.2,"displayImportRate":"10.9¢/kWh","displayExportRate":"5.9¢/kWh","displayBaseFee":"$9.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Almika Solar","providerType":"competitor","planName":"60 Energy Plus Buyback","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":60,"planType":"fixed_export","importRateCentsPerKwh":14.5,"exportRateCentsPerKwh":10,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":14.95,"estimatedAnnualCostDollars":1120.2,"displayImportRate":"14.5¢/kWh","displayExportRate":"10.0¢/kWh","displayBaseFee":"$14.95/mo","displayEarlyTerminationFee":"$14.95  per month","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Early termination fee listed by source: $14.95  per month."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver + Battery","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"battery_vpp","importRateCentsPerKwh":10.7,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1125.54,"displayImportRate":"10.7 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":true,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":2},"creditNotes":["Designed for homes that import more grid power than they export.","Battery VPP credit requires an eligible connected Tesla or SolarEdge battery.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77005","sourceUrl":"https://meterplan.com/plans?zipcode=77005","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Atlantex Power","providerType":"competitor","planName":"Glow Solar","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"real_time_wholesale","importRateCentsPerKwh":7.1,"exportRateCentsPerKwh":null,"exportRateType":"real_time_wholesale","baseFeeDollarsPerMonth":19.95,"earlyTerminationFeeDollars":20,"estimatedAnnualCostDollars":1146.6,"displayImportRate":"7.1¢/kWh","displayExportRate":"Real Time","displayBaseFee":"$19.95/mo","displayEarlyTerminationFee":"$20  per month","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Export credit is tied to real-time wholesale pricing.","Early termination fee listed by source: $20  per month."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Tesla Electric","providerType":"competitor","planName":"Drive Plan","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":10,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":null,"estimatedAnnualCostDollars":1150.8,"displayImportRate":"10.0¢/kWh","displayExportRate":"3.0¢/kWh","displayBaseFee":"None","displayEarlyTerminationFee":"None","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Early termination fee listed by source: None."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":11.25,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1171.74,"displayImportRate":"11.25 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Designed for homes that import more grid power than they export.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77005","sourceUrl":"https://meterplan.com/plans?zipcode=77005","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"competitor","planName":"Saver +Battery","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":10.3,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1176,"displayImportRate":"10.3¢/kWh","displayExportRate":"3.0¢/kWh","displayBaseFee":"None","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":true,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Chariot Energy","providerType":"competitor","planName":"Shine","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":36,"planType":"real_time_wholesale","importRateCentsPerKwh":8.9,"exportRateCentsPerKwh":null,"exportRateType":"real_time_wholesale","baseFeeDollarsPerMonth":9.95,"earlyTerminationFeeDollars":15,"estimatedAnnualCostDollars":1177.8,"displayImportRate":"8.9¢/kWh","displayExportRate":"Real Time","displayBaseFee":"$9.95/mo","displayEarlyTerminationFee":"$15  per month","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":true,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Export credit is tied to real-time wholesale pricing.","Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $15  per month."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Frontier Utilities","providerType":"competitor","planName":"Sun Confidence","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":8.9,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":9.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1177.8,"displayImportRate":"8.9¢/kWh","displayExportRate":"3.0¢/kWh","displayBaseFee":"$9.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":true,"enphase":true,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Gexa Energy","providerType":"competitor","planName":"Solar Buyback","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":8.9,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":9.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1177.8,"displayImportRate":"8.9¢/kWh","displayExportRate":"3.0¢/kWh","displayBaseFee":"$9.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":true,"enphase":true,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Meter Energy","providerType":"competitor","planName":"Saver","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":10.9,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1226.4,"displayImportRate":"10.9¢/kWh","displayExportRate":"3.0¢/kWh","displayBaseFee":"None","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":true,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Chariot Energy","providerType":"competitor","planName":"GreenVolt","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":11.2,"exportRateCentsPerKwh":7,"exportRateType":"fixed","baseFeeDollarsPerMonth":29.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1275,"displayImportRate":"11.2¢/kWh","displayExportRate":"7.0¢/kWh","displayBaseFee":"$29.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":true,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":36,"planType":"fixed_export","importRateCentsPerKwh":12.64,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":395,"estimatedAnnualCostDollars":1288.5,"displayImportRate":"12.64 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$395","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Designed for homes that import more grid power than they export.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77005","sourceUrl":"https://meterplan.com/plans?zipcode=77005","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Reliant Energy","providerType":"competitor","planName":"Truly Free Nights","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"free_nights","importRateCentsPerKwh":24.5,"exportRateCentsPerKwh":0,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1293.6,"displayImportRate":"24.5¢/kWh","displayExportRate":"0.0¢/kWh","displayBaseFee":"None","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":true,"enphase":true,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Free-night pricing depends on the share of usage shifted overnight.","Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"TXU Energy","providerType":"competitor","planName":"Solar Buyback Plus","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":12.8,"exportRateCentsPerKwh":6,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1313.4,"displayImportRate":"12.8¢/kWh","displayExportRate":"6.0¢/kWh","displayBaseFee":"$14.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Meter Energy","providerType":"meter","planName":"Standard","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"standard","importRateCentsPerKwh":10.11,"exportRateCentsPerKwh":0,"exportRateType":"none","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1327.98,"displayImportRate":"10.11 cents/kWh","displayExportRate":"0 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Non-solar fixed-rate plan included for comparison.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77005","sourceUrl":"https://meterplan.com/plans?zipcode=77005","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Green Mountain","providerType":"competitor","planName":"Solar Credit","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":10.7,"exportRateCentsPerKwh":5.7,"exportRateType":"fixed","baseFeeDollarsPerMonth":29.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1342.2,"displayImportRate":"10.7¢/kWh","displayExportRate":"5.7¢/kWh","displayBaseFee":"$29.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Reliant Energy","providerType":"competitor","planName":"Solar Payback Plus","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":10.9,"exportRateCentsPerKwh":5.9,"exportRateType":"fixed","baseFeeDollarsPerMonth":29.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1342.2,"displayImportRate":"10.9¢/kWh","displayExportRate":"5.9¢/kWh","displayBaseFee":"$29.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":true,"enphase":true,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Meter Energy","providerType":"meter","planName":"Standard","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":24,"planType":"standard","importRateCentsPerKwh":10.64,"exportRateCentsPerKwh":0,"exportRateType":"none","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":300,"estimatedAnnualCostDollars":1372.5,"displayImportRate":"10.64 cents/kWh","displayExportRate":"0 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$300","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Non-solar fixed-rate plan included for comparison.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77005","sourceUrl":"https://meterplan.com/plans?zipcode=77005","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Standard","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":36,"planType":"standard","importRateCentsPerKwh":10.79,"exportRateCentsPerKwh":0,"exportRateType":"none","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":395,"estimatedAnnualCostDollars":1385.1,"displayImportRate":"10.79 cents/kWh","displayExportRate":"0 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$395","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Non-solar fixed-rate plan included for comparison.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=77005","sourceUrl":"https://meterplan.com/plans?zipcode=77005","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"TXU Energy","providerType":"competitor","planName":"Solar Buyback Saver","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":11.9,"exportRateCentsPerKwh":3.5,"exportRateType":"fixed","baseFeeDollarsPerMonth":9.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1387.8,"displayImportRate":"11.9¢/kWh","displayExportRate":"3.5¢/kWh","displayBaseFee":"$9.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Ambit Energy","providerType":"competitor","planName":"Texas Solar Buyback","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":12.2,"exportRateCentsPerKwh":3.5,"exportRateType":"fixed","baseFeeDollarsPerMonth":9.95,"earlyTerminationFeeDollars":199,"estimatedAnnualCostDollars":1413,"displayImportRate":"12.2¢/kWh","displayExportRate":"3.5¢/kWh","displayBaseFee":"$9.95/mo","displayEarlyTerminationFee":"$199","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Early termination fee listed by source: $199."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Reliant Energy","providerType":"competitor","planName":"Solar Payback Match","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"real_time_wholesale","importRateCentsPerKwh":11.8,"exportRateCentsPerKwh":null,"exportRateType":"real_time_wholesale","baseFeeDollarsPerMonth":9.99,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1421.88,"displayImportRate":"11.8¢/kWh","displayExportRate":"Real Time","displayBaseFee":"$9.99/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":true,"enphase":true,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Export credit is tied to real-time wholesale pricing.","Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Chariot Energy","providerType":"competitor","planName":"Fusion","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":10.4,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":19.95,"earlyTerminationFeeDollars":15,"estimatedAnnualCostDollars":1423.8,"displayImportRate":"10.4¢/kWh","displayExportRate":"3.0¢/kWh","displayBaseFee":"$19.95/mo","displayEarlyTerminationFee":"$15  per month","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":true,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $15  per month."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Chariot Energy","providerType":"competitor","planName":"PowerBank","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":10.4,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":19.95,"earlyTerminationFeeDollars":15,"estimatedAnnualCostDollars":1423.8,"displayImportRate":"10.4¢/kWh","displayExportRate":"3.0¢/kWh","displayBaseFee":"$19.95/mo","displayEarlyTerminationFee":"$15  per month","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":true,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $15  per month."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Green Mountain","providerType":"competitor","planName":"Solar Max","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"real_time_wholesale","importRateCentsPerKwh":12,"exportRateCentsPerKwh":null,"exportRateType":"real_time_wholesale","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1498.2,"displayImportRate":"12.0¢/kWh","displayExportRate":"Real Time","displayBaseFee":"$14.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Export credit is tied to real-time wholesale pricing.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Green Mountain","providerType":"competitor","planName":"All Nighter","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":24,"planType":"free_nights","importRateCentsPerKwh":19.6,"exportRateCentsPerKwh":0,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":295,"estimatedAnnualCostDollars":1550.64,"displayImportRate":"19.6¢/kWh","displayExportRate":"0.0¢/kWh","displayBaseFee":"None","displayEarlyTerminationFee":"$295","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Free-night pricing depends on the share of usage shifted overnight.","Early termination fee listed by source: $295."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Just Energy","providerType":"competitor","planName":"Nights Free","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"free_nights","importRateCentsPerKwh":30.5,"exportRateCentsPerKwh":0,"exportRateType":"fixed","baseFeeDollarsPerMonth":4.99,"earlyTerminationFeeDollars":175,"estimatedAnnualCostDollars":1597.08,"displayImportRate":"30.5¢/kWh","displayExportRate":"0.0¢/kWh","displayBaseFee":"$4.99/mo","displayEarlyTerminationFee":"$175","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Free-night pricing depends on the share of usage shifted overnight.","Early termination fee listed by source: $175."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"TXU Energy","providerType":"competitor","planName":"Free Nights & Solar Days","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"free_nights","importRateCentsPerKwh":21.6,"exportRateCentsPerKwh":0,"exportRateType":"fixed","baseFeeDollarsPerMonth":9.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1770.84,"displayImportRate":"21.6¢/kWh","displayExportRate":"0.0¢/kWh","displayBaseFee":"$9.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Free-night pricing depends on the share of usage shifted overnight.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Direct Energy","providerType":"competitor","planName":"Twelve Hour Power","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":24,"planType":"free_nights","importRateCentsPerKwh":23.6,"exportRateCentsPerKwh":0,"exportRateType":"fixed","baseFeeDollarsPerMonth":9.95,"earlyTerminationFeeDollars":295,"estimatedAnnualCostDollars":1871.64,"displayImportRate":"23.6¢/kWh","displayExportRate":"0.0¢/kWh","displayBaseFee":"$9.95/mo","displayEarlyTerminationFee":"$295","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Free-night pricing depends on the share of usage shifted overnight.","Early termination fee listed by source: $295."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Ambit Energy","providerType":"competitor","planName":"Free & Clear Nights","tdu":"Centerpoint","representativeZipcode":"77005","termMonths":12,"planType":"free_nights","importRateCentsPerKwh":23.9,"exportRateCentsPerKwh":0,"exportRateType":"fixed","baseFeeDollarsPerMonth":9.95,"earlyTerminationFeeDollars":199,"estimatedAnnualCostDollars":1886.76,"displayImportRate":"23.9¢/kWh","displayExportRate":"0.0¢/kWh","displayBaseFee":"$9.95/mo","displayEarlyTerminationFee":"$199","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Free-night pricing depends on the share of usage shifted overnight.","Early termination fee listed by source: $199."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner + Battery","tdu":"Lubbock","representativeZipcode":"79401","termMonths":12,"planType":"battery_vpp","importRateCentsPerKwh":12.21,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1063.25,"displayImportRate":"12.21 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":true,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":2},"creditNotes":["Fixed export credit is locked for the contract term.","Battery VPP credit requires an eligible connected Tesla or SolarEdge battery.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=79401","sourceUrl":"https://meterplan.com/plans?zipcode=79401","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner","tdu":"Lubbock","representativeZipcode":"79401","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":12.82,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1114.49,"displayImportRate":"12.82 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Fixed export credit is locked for the contract term.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=79401","sourceUrl":"https://meterplan.com/plans?zipcode=79401","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver + Battery","tdu":"Lubbock","representativeZipcode":"79401","termMonths":12,"planType":"battery_vpp","importRateCentsPerKwh":10.21,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1135.85,"displayImportRate":"10.21 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":true,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":2},"creditNotes":["Designed for homes that import more grid power than they export.","Battery VPP credit requires an eligible connected Tesla or SolarEdge battery.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=79401","sourceUrl":"https://meterplan.com/plans?zipcode=79401","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver","tdu":"Lubbock","representativeZipcode":"79401","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":10.69,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1176.17,"displayImportRate":"10.69 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Designed for homes that import more grid power than they export.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=79401","sourceUrl":"https://meterplan.com/plans?zipcode=79401","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner","tdu":"Lubbock","representativeZipcode":"79401","termMonths":24,"planType":"fixed_export","importRateCentsPerKwh":14,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":300,"estimatedAnnualCostDollars":1213.61,"displayImportRate":"14 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$300","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Fixed export credit is locked for the contract term.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=79401","sourceUrl":"https://meterplan.com/plans?zipcode=79401","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner","tdu":"Lubbock","representativeZipcode":"79401","termMonths":36,"planType":"fixed_export","importRateCentsPerKwh":14.23,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":395,"estimatedAnnualCostDollars":1232.93,"displayImportRate":"14.23 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$395","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Fixed export credit is locked for the contract term.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=79401","sourceUrl":"https://meterplan.com/plans?zipcode=79401","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver","tdu":"Lubbock","representativeZipcode":"79401","termMonths":24,"planType":"fixed_export","importRateCentsPerKwh":12.37,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":300,"estimatedAnnualCostDollars":1317.29,"displayImportRate":"12.37 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$300","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Designed for homes that import more grid power than they export.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=79401","sourceUrl":"https://meterplan.com/plans?zipcode=79401","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver","tdu":"Lubbock","representativeZipcode":"79401","termMonths":36,"planType":"fixed_export","importRateCentsPerKwh":12.74,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":395,"estimatedAnnualCostDollars":1348.37,"displayImportRate":"12.74 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$395","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Designed for homes that import more grid power than they export.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=79401","sourceUrl":"https://meterplan.com/plans?zipcode=79401","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Standard","tdu":"Lubbock","representativeZipcode":"79401","termMonths":12,"planType":"standard","importRateCentsPerKwh":10.03,"exportRateCentsPerKwh":0,"exportRateType":"none","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1372.73,"displayImportRate":"10.03 cents/kWh","displayExportRate":"0 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Non-solar fixed-rate plan included for comparison.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=79401","sourceUrl":"https://meterplan.com/plans?zipcode=79401","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Standard","tdu":"Lubbock","representativeZipcode":"79401","termMonths":24,"planType":"standard","importRateCentsPerKwh":11.16,"exportRateCentsPerKwh":0,"exportRateType":"none","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":300,"estimatedAnnualCostDollars":1467.65,"displayImportRate":"11.16 cents/kWh","displayExportRate":"0 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$300","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Non-solar fixed-rate plan included for comparison.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=79401","sourceUrl":"https://meterplan.com/plans?zipcode=79401","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Standard","tdu":"Lubbock","representativeZipcode":"79401","termMonths":36,"planType":"standard","importRateCentsPerKwh":11.44,"exportRateCentsPerKwh":0,"exportRateType":"none","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":395,"estimatedAnnualCostDollars":1491.17,"displayImportRate":"11.44 cents/kWh","displayExportRate":"0 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$395","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Non-solar fixed-rate plan included for comparison.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=79401","sourceUrl":"https://meterplan.com/plans?zipcode=79401","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"competitor","planName":"Earner +Battery","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":11.4,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":984.48,"displayImportRate":"11.4¢/kWh","displayExportRate":"8.0¢/kWh","displayBaseFee":"$14.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":true,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner + Battery","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"battery_vpp","importRateCentsPerKwh":11.66,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1009.54,"displayImportRate":"11.66 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":true,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":2},"creditNotes":["Fixed export credit is locked for the contract term.","Battery VPP credit requires an eligible connected Tesla or SolarEdge battery.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75001","sourceUrl":"https://meterplan.com/plans?zipcode=75001","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"competitor","planName":"Earner","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":11.8,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1018.08,"displayImportRate":"11.8¢/kWh","displayExportRate":"8.0¢/kWh","displayBaseFee":"$14.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":true,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Direct Energy","providerType":"competitor","planName":"Direct Solar Unlimited","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":10.3,"exportRateCentsPerKwh":5.3,"exportRateType":"fixed","baseFeeDollarsPerMonth":9.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1058.88,"displayImportRate":"10.3¢/kWh","displayExportRate":"5.3¢/kWh","displayBaseFee":"$9.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":12.26,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1059.94,"displayImportRate":"12.26 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Fixed export credit is locked for the contract term.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75001","sourceUrl":"https://meterplan.com/plans?zipcode=75001","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"competitor","planName":"Saver +Battery","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":9.6,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1073.88,"displayImportRate":"9.6¢/kWh","displayExportRate":"3.0¢/kWh","displayBaseFee":"None","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":true,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Almika Solar","providerType":"competitor","planName":"60 Energy Plus Buyback","tdu":"Oncor","representativeZipcode":"75001","termMonths":60,"planType":"fixed_export","importRateCentsPerKwh":14.5,"exportRateCentsPerKwh":10,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":14.95,"estimatedAnnualCostDollars":1076.88,"displayImportRate":"14.5¢/kWh","displayExportRate":"10.0¢/kWh","displayBaseFee":"$14.95/mo","displayEarlyTerminationFee":"$14.95  per month","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Early termination fee listed by source: $14.95  per month."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Frontier Utilities","providerType":"competitor","planName":"Sun Confidence","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":8.3,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":9.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1084.08,"displayImportRate":"8.3¢/kWh","displayExportRate":"3.0¢/kWh","displayBaseFee":"$9.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":true,"enphase":true,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Gexa Energy","providerType":"competitor","planName":"Solar Buyback","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":8.3,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":9.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1084.08,"displayImportRate":"8.3¢/kWh","displayExportRate":"3.0¢/kWh","displayBaseFee":"$9.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":true,"enphase":true,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Atlantex Power","providerType":"competitor","planName":"Glow Solar","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"real_time_wholesale","importRateCentsPerKwh":7,"exportRateCentsPerKwh":null,"exportRateType":"real_time_wholesale","baseFeeDollarsPerMonth":19.95,"earlyTerminationFeeDollars":20,"estimatedAnnualCostDollars":1094.88,"displayImportRate":"7.0¢/kWh","displayExportRate":"Real Time","displayBaseFee":"$19.95/mo","displayEarlyTerminationFee":"$20  per month","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Export credit is tied to real-time wholesale pricing.","Early termination fee listed by source: $20  per month."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Chariot Energy","providerType":"competitor","planName":"Shine","tdu":"Oncor","representativeZipcode":"75001","termMonths":36,"planType":"real_time_wholesale","importRateCentsPerKwh":8.5,"exportRateCentsPerKwh":null,"exportRateType":"real_time_wholesale","baseFeeDollarsPerMonth":9.95,"earlyTerminationFeeDollars":15,"estimatedAnnualCostDollars":1100.88,"displayImportRate":"8.5¢/kWh","displayExportRate":"Real Time","displayBaseFee":"$9.95/mo","displayEarlyTerminationFee":"$15  per month","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":true,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Export credit is tied to real-time wholesale pricing.","Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $15  per month."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Tesla Electric","providerType":"competitor","planName":"Drive Plan","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":10,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":null,"estimatedAnnualCostDollars":1107.48,"displayImportRate":"10.0¢/kWh","displayExportRate":"3.0¢/kWh","displayBaseFee":"None","displayEarlyTerminationFee":"None","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Early termination fee listed by source: None."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver + Battery","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"battery_vpp","importRateCentsPerKwh":9.98,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1109.02,"displayImportRate":"9.98 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":true,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":2},"creditNotes":["Designed for homes that import more grid power than they export.","Battery VPP credit requires an eligible connected Tesla or SolarEdge battery.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75001","sourceUrl":"https://meterplan.com/plans?zipcode=75001","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner","tdu":"Oncor","representativeZipcode":"75001","termMonths":24,"planType":"fixed_export","importRateCentsPerKwh":12.85,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":300,"estimatedAnnualCostDollars":1109.5,"displayImportRate":"12.85 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$300","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Fixed export credit is locked for the contract term.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75001","sourceUrl":"https://meterplan.com/plans?zipcode=75001","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"competitor","planName":"Saver","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":10.1,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1115.88,"displayImportRate":"10.1¢/kWh","displayExportRate":"3.0¢/kWh","displayBaseFee":"None","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":true,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":10.44,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1147.66,"displayImportRate":"10.44 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Designed for homes that import more grid power than they export.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75001","sourceUrl":"https://meterplan.com/plans?zipcode=75001","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Chariot Energy","providerType":"competitor","planName":"GreenVolt","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":10.2,"exportRateCentsPerKwh":7,"exportRateType":"fixed","baseFeeDollarsPerMonth":29.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1147.68,"displayImportRate":"10.2¢/kWh","displayExportRate":"7.0¢/kWh","displayBaseFee":"$29.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":true,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver","tdu":"Oncor","representativeZipcode":"75001","termMonths":24,"planType":"fixed_export","importRateCentsPerKwh":11.53,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":300,"estimatedAnnualCostDollars":1239.22,"displayImportRate":"11.53 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$300","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Designed for homes that import more grid power than they export.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75001","sourceUrl":"https://meterplan.com/plans?zipcode=75001","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Reliant Energy","providerType":"competitor","planName":"Truly Free Nights","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"free_nights","importRateCentsPerKwh":24.3,"exportRateCentsPerKwh":0,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1275.48,"displayImportRate":"24.3¢/kWh","displayExportRate":"0.0¢/kWh","displayBaseFee":"None","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":true,"enphase":true,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Free-night pricing depends on the share of usage shifted overnight.","Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver","tdu":"Oncor","representativeZipcode":"75001","termMonths":36,"planType":"fixed_export","importRateCentsPerKwh":11.98,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":395,"estimatedAnnualCostDollars":1277.02,"displayImportRate":"11.98 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$395","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Designed for homes that import more grid power than they export.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75001","sourceUrl":"https://meterplan.com/plans?zipcode=75001","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"TXU Energy","providerType":"competitor","planName":"Solar Buyback Plus","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":12.9,"exportRateCentsPerKwh":6,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1278.48,"displayImportRate":"12.9¢/kWh","displayExportRate":"6.0¢/kWh","displayBaseFee":"$14.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Green Mountain","providerType":"competitor","planName":"Solar Credit","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":11.3,"exportRateCentsPerKwh":6.3,"exportRateType":"fixed","baseFeeDollarsPerMonth":29.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1298.88,"displayImportRate":"11.3¢/kWh","displayExportRate":"6.3¢/kWh","displayBaseFee":"$29.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Reliant Energy","providerType":"competitor","planName":"Solar Payback Plus","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":11.3,"exportRateCentsPerKwh":6.3,"exportRateType":"fixed","baseFeeDollarsPerMonth":29.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1298.88,"displayImportRate":"11.3¢/kWh","displayExportRate":"6.3¢/kWh","displayBaseFee":"$29.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":true,"enphase":true,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Chariot Energy","providerType":"competitor","planName":"Fusion","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":9.9,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":19.95,"earlyTerminationFeeDollars":15,"estimatedAnnualCostDollars":1338.48,"displayImportRate":"9.9¢/kWh","displayExportRate":"3.0¢/kWh","displayBaseFee":"$19.95/mo","displayEarlyTerminationFee":"$15  per month","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":true,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $15  per month."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Chariot Energy","providerType":"competitor","planName":"PowerBank","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":9.9,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":19.95,"earlyTerminationFeeDollars":15,"estimatedAnnualCostDollars":1338.48,"displayImportRate":"9.9¢/kWh","displayExportRate":"3.0¢/kWh","displayBaseFee":"$19.95/mo","displayEarlyTerminationFee":"$15  per month","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":true,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $15  per month."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"TXU Energy","providerType":"competitor","planName":"Solar Buyback Saver","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":11.9,"exportRateCentsPerKwh":3.5,"exportRateType":"fixed","baseFeeDollarsPerMonth":9.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1344.48,"displayImportRate":"11.9¢/kWh","displayExportRate":"3.5¢/kWh","displayBaseFee":"$9.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Meter Energy","providerType":"meter","planName":"Standard","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"standard","importRateCentsPerKwh":9.94,"exportRateCentsPerKwh":0,"exportRateType":"none","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1357.66,"displayImportRate":"9.94 cents/kWh","displayExportRate":"0 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Non-solar fixed-rate plan included for comparison.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75001","sourceUrl":"https://meterplan.com/plans?zipcode=75001","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Reliant Energy","providerType":"competitor","planName":"Solar Payback Match","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"real_time_wholesale","importRateCentsPerKwh":11.6,"exportRateCentsPerKwh":null,"exportRateType":"real_time_wholesale","baseFeeDollarsPerMonth":9.99,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1361.76,"displayImportRate":"11.6¢/kWh","displayExportRate":"Real Time","displayBaseFee":"$9.99/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":true,"enphase":true,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Export credit is tied to real-time wholesale pricing.","Battery credit support depends on battery brand and program eligibility.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Meter Energy","providerType":"meter","planName":"Standard","tdu":"Oncor","representativeZipcode":"75001","termMonths":24,"planType":"standard","importRateCentsPerKwh":10.44,"exportRateCentsPerKwh":0,"exportRateType":"none","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":300,"estimatedAnnualCostDollars":1399.66,"displayImportRate":"10.44 cents/kWh","displayExportRate":"0 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$300","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Non-solar fixed-rate plan included for comparison.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75001","sourceUrl":"https://meterplan.com/plans?zipcode=75001","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Ambit Energy","providerType":"competitor","planName":"Texas Solar Buyback","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":12.6,"exportRateCentsPerKwh":3.5,"exportRateType":"fixed","baseFeeDollarsPerMonth":9.95,"earlyTerminationFeeDollars":199,"estimatedAnnualCostDollars":1403.28,"displayImportRate":"12.6¢/kWh","displayExportRate":"3.5¢/kWh","displayBaseFee":"$9.95/mo","displayEarlyTerminationFee":"$199","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Early termination fee listed by source: $199."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Green Mountain","providerType":"competitor","planName":"Solar Max","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"real_time_wholesale","importRateCentsPerKwh":11.4,"exportRateCentsPerKwh":null,"exportRateType":"real_time_wholesale","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1404.48,"displayImportRate":"11.4¢/kWh","displayExportRate":"Real Time","displayBaseFee":"$14.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Export credit is tied to real-time wholesale pricing.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Meter Energy","providerType":"meter","planName":"Standard","tdu":"Oncor","representativeZipcode":"75001","termMonths":36,"planType":"standard","importRateCentsPerKwh":10.76,"exportRateCentsPerKwh":0,"exportRateType":"none","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":395,"estimatedAnnualCostDollars":1426.54,"displayImportRate":"10.76 cents/kWh","displayExportRate":"0 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$395","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Non-solar fixed-rate plan included for comparison.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75001","sourceUrl":"https://meterplan.com/plans?zipcode=75001","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Green Mountain","providerType":"competitor","planName":"All Nighter","tdu":"Oncor","representativeZipcode":"75001","termMonths":24,"planType":"free_nights","importRateCentsPerKwh":20.1,"exportRateCentsPerKwh":0,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":295,"estimatedAnnualCostDollars":1532.52,"displayImportRate":"20.1¢/kWh","displayExportRate":"0.0¢/kWh","displayBaseFee":"None","displayEarlyTerminationFee":"$295","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Free-night pricing depends on the share of usage shifted overnight.","Early termination fee listed by source: $295."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Just Energy","providerType":"competitor","planName":"Nights Free","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"free_nights","importRateCentsPerKwh":30.3,"exportRateCentsPerKwh":0,"exportRateType":"fixed","baseFeeDollarsPerMonth":4.99,"earlyTerminationFeeDollars":175,"estimatedAnnualCostDollars":1587,"displayImportRate":"30.3¢/kWh","displayExportRate":"0.0¢/kWh","displayBaseFee":"$4.99/mo","displayEarlyTerminationFee":"$175","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Free-night pricing depends on the share of usage shifted overnight.","Early termination fee listed by source: $175."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"TXU Energy","providerType":"competitor","planName":"Free Nights & Solar Days","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"free_nights","importRateCentsPerKwh":21.6,"exportRateCentsPerKwh":0,"exportRateType":"fixed","baseFeeDollarsPerMonth":9.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1727.52,"displayImportRate":"21.6¢/kWh","displayExportRate":"0.0¢/kWh","displayBaseFee":"$9.95/mo","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Free-night pricing depends on the share of usage shifted overnight.","Early termination fee listed by source: $150."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Ambit Energy","providerType":"competitor","planName":"Free & Clear Nights","tdu":"Oncor","representativeZipcode":"75001","termMonths":12,"planType":"free_nights","importRateCentsPerKwh":23.9,"exportRateCentsPerKwh":0,"exportRateType":"fixed","baseFeeDollarsPerMonth":9.95,"earlyTerminationFeeDollars":199,"estimatedAnnualCostDollars":1843.44,"displayImportRate":"23.9¢/kWh","displayExportRate":"0.0¢/kWh","displayBaseFee":"$9.95/mo","displayEarlyTerminationFee":"$199","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Free-night pricing depends on the share of usage shifted overnight.","Early termination fee listed by source: $199."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Direct Energy","providerType":"competitor","planName":"Twelve Hour Power","tdu":"Oncor","representativeZipcode":"75001","termMonths":24,"planType":"free_nights","importRateCentsPerKwh":24.1,"exportRateCentsPerKwh":0,"exportRateType":"fixed","baseFeeDollarsPerMonth":9.95,"earlyTerminationFeeDollars":295,"estimatedAnnualCostDollars":1853.52,"displayImportRate":"24.1¢/kWh","displayExportRate":"0.0¢/kWh","displayBaseFee":"$9.95/mo","displayEarlyTerminationFee":"$295","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":null},"creditNotes":["Free-night pricing depends on the share of usage shifted overnight.","Early termination fee listed by source: $295."],"signupUrl":null,"sourceUrl":"https://meterplan.com/solarbuybackplans","updatedAt":"2026-04-15T15:57:43.55281+00:00"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner + Battery","tdu":"TNMP","representativeZipcode":"75057","termMonths":12,"planType":"battery_vpp","importRateCentsPerKwh":11.75,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1131.79,"displayImportRate":"11.75 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":true,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":2},"creditNotes":["Fixed export credit is locked for the contract term.","Battery VPP credit requires an eligible connected Tesla or SolarEdge battery.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75057","sourceUrl":"https://meterplan.com/plans?zipcode=75057","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner","tdu":"TNMP","representativeZipcode":"75057","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":12.35,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1182.19,"displayImportRate":"12.35 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Fixed export credit is locked for the contract term.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75057","sourceUrl":"https://meterplan.com/plans?zipcode=75057","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner","tdu":"TNMP","representativeZipcode":"75057","termMonths":24,"planType":"fixed_export","importRateCentsPerKwh":12.94,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":300,"estimatedAnnualCostDollars":1231.75,"displayImportRate":"12.94 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$300","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Fixed export credit is locked for the contract term.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75057","sourceUrl":"https://meterplan.com/plans?zipcode=75057","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Earner","tdu":"TNMP","representativeZipcode":"75057","termMonths":36,"planType":"fixed_export","importRateCentsPerKwh":13.17,"exportRateCentsPerKwh":8,"exportRateType":"fixed","baseFeeDollarsPerMonth":14.95,"earlyTerminationFeeDollars":395,"estimatedAnnualCostDollars":1251.07,"displayImportRate":"13.17 cents/kWh","displayExportRate":"8 cents/kWh","displayBaseFee":"$14.95/month","displayEarlyTerminationFee":"$395","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Fixed export credit is locked for the contract term.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75057","sourceUrl":"https://meterplan.com/plans?zipcode=75057","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver + Battery","tdu":"TNMP","representativeZipcode":"75057","termMonths":12,"planType":"battery_vpp","importRateCentsPerKwh":10.58,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1274.11,"displayImportRate":"10.58 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":true,"solaredge":true,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":2},"creditNotes":["Designed for homes that import more grid power than they export.","Battery VPP credit requires an eligible connected Tesla or SolarEdge battery.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75057","sourceUrl":"https://meterplan.com/plans?zipcode=75057","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver","tdu":"TNMP","representativeZipcode":"75057","termMonths":12,"planType":"fixed_export","importRateCentsPerKwh":11.11,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1318.63,"displayImportRate":"11.11 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Designed for homes that import more grid power than they export.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75057","sourceUrl":"https://meterplan.com/plans?zipcode=75057","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver","tdu":"TNMP","representativeZipcode":"75057","termMonths":24,"planType":"fixed_export","importRateCentsPerKwh":12.2,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":300,"estimatedAnnualCostDollars":1410.19,"displayImportRate":"12.2 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$300","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Designed for homes that import more grid power than they export.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75057","sourceUrl":"https://meterplan.com/plans?zipcode=75057","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Saver","tdu":"TNMP","representativeZipcode":"75057","termMonths":36,"planType":"fixed_export","importRateCentsPerKwh":12.58,"exportRateCentsPerKwh":3,"exportRateType":"fixed","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":395,"estimatedAnnualCostDollars":1442.11,"displayImportRate":"12.58 cents/kWh","displayExportRate":"3 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$395","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Designed for homes that import more grid power than they export.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75057","sourceUrl":"https://meterplan.com/plans?zipcode=75057","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Standard","tdu":"TNMP","representativeZipcode":"75057","termMonths":12,"planType":"standard","importRateCentsPerKwh":10.03,"exportRateCentsPerKwh":0,"exportRateType":"none","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":150,"estimatedAnnualCostDollars":1479.91,"displayImportRate":"10.03 cents/kWh","displayExportRate":"0 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$150","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Non-solar fixed-rate plan included for comparison.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75057","sourceUrl":"https://meterplan.com/plans?zipcode=75057","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Standard","tdu":"TNMP","representativeZipcode":"75057","termMonths":24,"planType":"standard","importRateCentsPerKwh":10.56,"exportRateCentsPerKwh":0,"exportRateType":"none","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":300,"estimatedAnnualCostDollars":1524.43,"displayImportRate":"10.56 cents/kWh","displayExportRate":"0 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$300","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Non-solar fixed-rate plan included for comparison.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75057","sourceUrl":"https://meterplan.com/plans?zipcode=75057","updatedAt":"2026-04-30T22:54:57.654Z"},{"providerName":"Meter Energy","providerType":"meter","planName":"Standard","tdu":"TNMP","representativeZipcode":"75057","termMonths":36,"planType":"standard","importRateCentsPerKwh":10.81,"exportRateCentsPerKwh":0,"exportRateType":"none","baseFeeDollarsPerMonth":0,"earlyTerminationFeeDollars":395,"estimatedAnnualCostDollars":1545.43,"displayImportRate":"10.81 cents/kWh","displayExportRate":"0 cents/kWh","displayBaseFee":"$0/month","displayEarlyTerminationFee":"$395","batterySupport":{"tesla":false,"solaredge":false,"enphase":false,"qcells":false,"meterStorageCreditDollarsPerKwhMonth":0},"creditNotes":["Non-solar fixed-rate plan included for comparison.","Displayed cost uses default profile assumptions and does not include any private commission fields."],"signupUrl":"https://meterplan.com/plans?zipcode=75057","sourceUrl":"https://meterplan.com/plans?zipcode=75057","updatedAt":"2026-04-30T22:54:57.654Z"}]}